The Fiji Roads Authority (FRA) has announced the temporary nightly closure of Wainibau Bridge along Baulevu Road to allow essential bridge upgrade works.
The bridge will be closed daily from 8pm to 5am, starting on 1 August and continuing until 15 August, subject to favourable weather conditions.
Despite the closure, emergency vehicles will continue to have access throughout the construction period.
The FRA says temporary traffic diversions will be in place to safely guide motorists and pedestrians through the work area.
Advance warning signs will also be installed, while traffic controllers will be stationed on site to assist road users and direct them to the designated bypass route.
Motorists travelling through the area are advised to plan their trips accordingly during the two-week construction period.
A Journey of Resilience Behind Faith Work Enterprise
Nov 10, 2026, 08:02 PM
Accountants Urged To Embrace Technology And Uphold Professional Standards
Nov 10, 2026, 07:34 PM
Over 12 thousand Year 12 students to sit for national...
Nov 10, 2026, 07:00 PM
Nadi Airport upgrades aircraft docking technology
Nov 10, 2026, 06:58 PM
‘I Had to Save My Own Home’: Bushfire Threatens Anand...
Nov 10, 2026, 06:24 PM
A Journey of Resilience Behind Faith Work Enterprise
Nov 10, 2026, 08:02 PM
Accountants Urged To Embrace Technology And Uphold Professional Standards
Nov 10, 2026, 07:34 PM
Over 12 thousand Year 12 students to sit for national...
Nov 10, 2026, 07:00 PM
Nadi Airport upgrades aircraft docking technology
Nov 10, 2026, 06:58 PM
‘I Had to Save My Own Home’: Bushfire Threatens Anand...
Nov 10, 2026, 06:24 PM